CO129-181 - Governor Hennessy - 1878 [1-8] — Page 124

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

Appendix B.

123

list

ESTIMATE FOR the construction of 10 feet liid of Prays wall as per

Generals

ox me by

DAS OF SU I loode). 487

print Design amended o

41 coul

reali

per

cubic foot ..

Paving the Randway to Praya with

granite blocks, the beds and joints

worked straight

and

PART OF

ILDING,

DESCRIPTION OF WORK.

No.

L.

B.

D

CONTENT.

RATE.

AMOUNT.

Uh

squares,

the

face rough punched and set in Forsland cement will cost about

wall. Taking down old

masonry & removing malivals

cking Excavating grounds

10.02.

10.0

6.0

10.0270

110.0

4.6 10.6

492.6

07.

9.45

9.3

fo

12 way Cannel

& removing surplus materials

2.0

231. 3

120.0

by boat

100.0

Do

10.0 3.6

110

35.0

566.3

Scraping

cut

- joint's

I's and pointing

26

20.257445

4 25

5. 24

180.0

15 Cents

per foot lineal.

10.0

9.0

2.0

627 y

3.33

in neat Portland Cement Costs

undation Excavating ground

below low water and

Removing 30 by boat +being rock

undation Portland cement

Concrete 4 to 1

Inglourds Granite achter

masonry set in Port

land cement in blocks

excuding 15ft eubicall

conlink.

10.0

2.0

180.0

18

6574 7.27

48.46

10.05.6

2.0

110.0

10.0 41.0 2.0

80.0

190 0

bo

114.00

Carried over $207.80

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.